A post-production schedule that moves with the edit.

Here’s how a documentary team could run post on Kapcal, from assembly to delivery. The film, names and dates are made up; any project with phases and deadlines works the same way.

A category for each kind of work

Edit, VFX, Colour, Sound & Mix and Deliverables, plus Suites for room bookings and Meetings. Each keeps its colour on every view.

A project for each film

The documentary and the series sit side by side on one board; hide one to focus on the other.

Phases and tracks

The Edit phase holds the assembly, the rough cut review and picture lock. Picture and Sound run as their own tracks on the timeline.

Picture lock as a milestone

Colour, VFX and the sound edit follow picture lock. If the cut runs long, they move with it, to the next working day.

A delivery date that doesn’t move

Lock the delivery date. If the mix would run into it, Kapcal says so straight away, before anyone misses it.

Room bookings

Suite 1 and Suite 2 are categories too: show just one to see who’s in it this month.

Each team sees its part

The picture team, the sound team and the broadcaster each get a saved view; the broadcaster’s is a read-only link.

In step with the crew’s tools

Editors keep their Asana tasks and the producer keeps Outlook; the dates stay in step both ways.

Not in post?

Swap the phases for a product launch, an event season or a building project: categories, phases, milestones and locked deadlines work the same way.

Put the whole schedule on one board.

Free plan, no card needed.